MODULE II
Solar energy technology Page 17

Module II ServitecStartPrevious pageNext pageEnd



Diagram 14 shows the proportional costs of a solar energy installation as a function of the collector area. Data like this provides the service technicians with important information he needs in order to calculate the prices and costs of the devices and systems offered by his company.

Diagram 14: Division of the proportional costs of a solar energy installation as a function of the collector area




English translation of technical terms and sentences in diagram 14:

Planung
= Planning
Inbetriebnahme und Montage = Installation and putting into service
Regelung = Regulation and control
Verrohrung = Pipes
Speicher und Wärmeübertrager = Storage system and heat exchangers
Aufständerung = Mounting of storage system
Kollektormontage = Collector installation
Kollektoren = Collectors
Spezifische Kosten in DM/m2 Kollektorfläche = Specific costs in DM/m2 of collector area

 

Module II ServitecStartPrevious pageNext pageEnd


• • Copyright © IWB e.V. 1996-2000 • Design, technical realisation and webmaster: ohlendorf@ohlendorf.de • •
• • Sponsored by EDUVINET • 800 x 600 recommended • •